DREAM


Version 6.0 (26/04/2017)

Kitchen and Dining Facilities

Version: 6

New Build

Survey

 

 

 

 

Not Logged In


Biodiversity

External EQ

Energy

Internal EQ

Procurement

Travel

Water

Waste

Biodiversity & Environmental Protection

  No code title max credits
  1 BI  1 Brownfield Site  
    Is the development on a previously built-upon site? 

Guidance Note >>

1

  2 BI  2 Land Contamination Survey  
    Have desk studies and site investigations, including soil analysis, been carried out to identify potential risks to health, safety, ecology and property? 

Guidance Note >>

1

  3 BI  3 Remediation Method  
    Has a remediation strategy been developed which maximises 'in-situ' remediation and minimises 'dig and dump? 

Guidance Note >>

1

  4 BI  4 Preliminary Ecological Appraisal  
    Has a Preliminary Ecological Appraisal (PEA) been undertaken to evaluate the baseline ecological characteristics of the site, including an assessment of the potential impact of the development, mitigation measures and potential enhancement? 

Guidance Note >>

2

  5 BI  5 Protection and Enhancement of the Historic Environment  
    Has an assessment been carried out to establish the presence and extent of historic environment features on the site and to obtain a measure of their significance? 

Guidance Note >>

1